|
Jun 1954 - Threlkeld Quarry
Jun 1954 - Threlkeld Quarry Loading of dry stone from the hoppers into a Ford Thames model ET 6 5-ton truck, one of the company's road transport fleet. On the left may be seen the grading conveyor to which the requisite percentages of the various sized stone are fed from the bunkers when a mixed load is desired (from Mine & Quarry Engineering [June, 1954]) Image Reference: L-00745-03-0065-F17 |
![]() |
||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2008 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608 Page last updated: 20 May 2008 |
Search |
|
|